Brief Description and Scope of Work: This project delivered reliable renewable power to an off-grid location in Odigbo LGA, Ondo State. The project deployed an energy mix of solar PV, energy storage, and onsite diesel generation. With ground-mounted solar PV and lithium the system since commissioning has been running at 100% renewable fraction leading to the diesel generator not being used till date although that will change with the increase in load and connection of anchor loads in the community. The work carried out by the Triple E team involved: (a.) Determination of the technical feasibility of energy resource for power generation; (b) Determination of the expected power output; (c) If feasible, development of preliminary engineering layout and specifications for the plant;(d) Determination of the method for power evacuation; (e) Development of a cost estimate for the generation plant as well as the power evacuation facilities; (f) implementation of financial and economic studies; and (g) the development of a project implementation plan; (h) Procurement, Construction and Operation of the Solar PV Hybrid system.
Client: Triple E Systems Associates Limited
Duration: January 2023 – July 2024
Referee: https://www.youtube.com/watch?v=Ld-36lYbYmU